Redesigning a live shop without stopping sales

A fashion retailer wanted to modernise its theme and checkout without ever interrupting sales in progress.

Describe my issue Send a message

The context

The shop ran on an ageing theme, poorly suited to mobile browsing even though mobile accounted for most of the traffic. A full redesign was needed, but the shop stayed active and generating orders throughout the project: switching abruptly to a new theme on a given day was out of the question, with the risk of discovering regressions in production on a checkout that had to keep working without interruption.

The approach taken was therefore to roll out the redesign progressively, section by section, rather than in a single global switch.

What I did

  1. Splitting the redesign scope

    Splitting the site into zones that could be redesigned independently: homepage, category listings, product page, checkout.

  2. Building on a separate environment

    Each section was built and tested on a staging environment before going live, using real data to check behaviour.

  3. Staged rollout

    Progressive go-live, one validated section after another, monitoring sales metrics and checkout behaviour after each step.

  4. Rollback plan

    Every deployment came with the ability to revert quickly to the previous version if an issue was spotted after going live.

Frequently asked questions

Why not redesign the whole site in one go?
A global switch maximises the risk: an unforeseen regression then hits the whole site at once. A staged approach limits the impact of each change and makes diagnosing a problem easier.
Was SEO affected by the redesign?
The staged rollout made it possible to check, section by section, that URLs and markup stayed consistent before moving on, rather than discovering a site-wide problem afterwards.
How long does a redesign like this take?
It depends on how many sections need redesigning and the pace of validation wanted between each step; a staged approach generally takes longer in calendar time than a single switch, in exchange for a much lower risk.
What happens if an issue is spotted after a step?
The rollback plan built into every deployment allows a quick return to the previous version while the issue is fixed, without leaving the checkout degraded in production.

Describe your need in one minute

A few targeted questions so I can reply with an estimate rather than another questionnaire.

similarite
difference (facultatif)
contexte
echeance (facultatif)
Please provide an email or a phone number so I can get back to you.

Please provide an email or a phone number so I can get back to you.